CONSTRUCTION

Construction Construction in real estate refers to the entire process of developing a building or infrastructure from the initial idea to the final handover. It begins with identifying suitable land and understanding whether the project is financially and technically feasible. Developers conduct feasibility studies to analyze the cost, expected returns, market demand, and legal aspects. Once they finalize a location, they perform soil testing, environmental analysis, and create a financial plan involving bank loans, investors, or pre-sales. After the planning stage, the project moves into designing, where architects prepare the building’s layout, floor plans, and elevations. Structural engineers calculate loads and design the foundation and framework to ensure the building’s stability and safety. MEP engineers plan mechanical, electrical, and plumbing systems, including HVAC, fire safety, and elevators. All these designs are then submitted to government authorities for approvals, such as building plan sanction, environment clearance, fire department approval, and occupancy-related permissions.

Once the designs are approved, the site is prepared for construction. This includes clearing the land, leveling it, setting up construction offices, fences, and temporary utilities. Excavation begins to prepare the site for the foundation. The construction phase truly starts with foundation work, which may include excavation, laying footings, concrete works, basement construction, and waterproofing. After the foundation is completed, the building’s superstructure takes shape with the construction of columns, beams, slabs, staircases, and walls. As the building rises, parallel work begins on mechanical, electrical, and plumbing installations. This includes wiring, pipe fitting, sewer connections, drain systems, ventilation, air-conditioning systems, fire alarms, and lift installation.

Once the structure is complete, finishing work begins, which gives the building its final appearance. This covers plastering, tiling, painting, ceiling work, carpentry, installation of doors, windows, kitchen cabinets, wardrobes, sanitary fittings, and electrical fixtures. The surroundings of the building are also developed through landscaping, paving, boundary walls, and parking areas. After all construction and finishing work is complete, the building undergoes quality inspections to ensure all systems function properly. Developers conduct checks to identify minor defects, known as snags, which are repaired before handover. Government authorities then issue certificates such as the Occupancy Certificate (OC), ensuring the building is safe for use. Once all approvals are in place, the property is handed over to the buyers or tenants.

Throughout the entire process, many stakeholders are involved, including architects, engineers, contractors, subcontractors, suppliers, and government officials. Various materials like cement, steel, bricks, concrete, tiles, wood, and glass are used at different stages of construction. Modern construction also involves advanced technologies such as precast panels, modular building techniques, and eco-friendly materials that support sustainability and energy efficiency. The cost of construction depends on location, material choice, labor rates, design complexity, and finishing standards. Real estate construction is a complex, multi-stage process that requires careful planning, technical expertise, financial management, and strict adherence to safety and quality standards to deliver a durable, functional, and aesthetically pleasing building.

Completed Projects

Buildings or units where construction is almost finished, with final inspections, fittings, or approvals underway. Property where construction is finished but units are still being marketed or delivered to buyers. Often used by investors to identify low-risk development opportunities, since most construction risks are past.

PROPTREE CONSTRUCTION PROVIDE COMPLETE RANGE OF CONSTRUCTION SOLUION TO THERE CLIENTS IN GREATER NOIDA & YAMUNA EXPRESSWAY.

 ITS HELP PLOTS OWNER OF YEIDA TO GET THERE COMPLETION CERIFICATE WITHOUT ANY HASSLE AT REGANABLE PRICE

  • COMPLETION REQUIRED BY YAMUNA EXPRESSWAY AUTHORITY WITHER 3 YEAR FROM THE DATE OF LEASE DEED
  • DETAILS OF MINIMUM CONSTRUCTED AREA REQUIRED FOR COMPLETION CERTIFICATE

(A) Calculation Details (As per Floor Area Ratio)

Plot Area

(Sq Mtr)

Ground

Coverage

Ground Coverage

(Sq Mtr)

Floor Area

Ratio (FAR)

Floor Area Ratio

(Sq Mtr)

Min Construction

(% of FAR)

Min Construction

(Sq Mtr)

APPOX

(Sq Mtr)

Min Construction

(Sq Ft)

APPOX

(Sq Ft)

30075 %300 x 75% =   225180300 x 1.8 =   54020.80  540 x 20.80 % = 112.32112.501209.0021210.00
50065 %500 x 65% =   325180500 x 1.8 =   90018.05  900 x 18.05 % = 162.45162.501748.5971749.00
100055 %1000 x 55% =   5501501000 x 1.5 = 150018.331500 x 18.33 % = 274.95275.002959.5372960.00
200045 %2000 x 45% =   9001502000 x 1.5 = 300015.003000 x 15.00 % = 450.00450.004843.7604844.00
400040 %4000 x 40% = 16001004000 x 1.0 = 400020.004000 x 20.00 % = 800.00800.008611.1288612.00

(B) Calculation Details (As per Ground Coverage)

Plot Area

(Sq Mtr)

Ground

Coverage

Ground Coverage

(Sq Mtr)

50% of Ground Coverage

(Sq Mtr)

Min Construction

(Sq Ft)

APPOX

(Sq Ft)

30075 %300 x 75% =   225112.501209.0021210.00
50065 %500 x 65% =   325162.501748.5971749.00
100055 %1000 x 55% =   550275.002959.5372960.00
200045 %2000 x 45% =   900450.004843.7604844.00
400040 %4000 x 40% = 1600800.008611.1288612.00

CONTACT TEAM PROPTREE CONSTRUCTION FOR MORE DETAILS

AKHIL JHA –  9910002213

AJIT SINGH – 9650384554

RAJENDRA – 9999736112